Assessment Year | 2015 |
---|---|
Principal Product | Bread |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $5 M to 10M |
# of Employees | 300 |
Plant Area |
71,200
ft2
|
Annual Production | 51,000,000
pieces
|
Production Hrs. Annual | 8,712
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $434,842 | 7,726,500 |
kWh
|
$0.056 |
Electricity Demand | $75,991 | 13,936 |
kW-mo/yr
|
$5.45 |
Electricity Fees | $75,499 | - |
|
- |
Natural Gas | $355,781 | 70,583 |
MMBtu
|
$5.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,981 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,402 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,826 | $4,986 |
$5,826
90,856
kWh
|
- | - | |
02 | 2.1113: Reduce combustion air flow to optimum | $8,293 | $800 | - | - |
$8,293
-
MMBtu
|
|
03 | 2.1116: Improve combustion control capability | $8,286 | $7,123 |
$3,284
51,231
kWh
|
- |
$5,002
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,576 | $25,575 |
$23,084
360,007
kWh
|
$1,492
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $46,981 | $38,484 |
$32,194
502,094
kWh
|
$1,492
-
kW-mo/yr
|
$13,295
-
MMBtu
|
||
TOTAL IMPLEMENTED | $30,402 | $30,561 |
$28,910
450,863
kWh
|
$1,492
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs