ITAC Assessment: OR0644
ITAC logo
ITAC Assessment: OR0644
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Titanium Castings
NAICS 331410: Nonferrous Metal (except Aluminum) Smelting and Refining
SIC 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 130,000
ft2
Annual Production 1,125,686
units
Production Hrs. Annual 7,478
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $835,179 15,212,736
kWh
Electricity Demand $169,988 34,691
kW-mo/yr
Electricity Fees $2,737 -
Natural Gas $184,621 37,740
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $728,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $146,773

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
01 3.1191: Change procedures / equipment / operating conditions $456,074 $95,650 $1,282
23,357
kWh
- - - $454,792
02 2.1116: Improve combustion control capability $122,402 $38,517 - - $122,402
-
MMBtu
- -
03 3.1161: Eliminate/reduce an operation $106,634 $72,750 - - - $106,634 -
04 2.4224: Upgrade controls on compressors $37,274 $20,400 $34,151
622,061
kWh
$3,123
-
kW-mo/yr
- - -
05 2.4239: Eliminate or reduce compressed air usage $3,431 $1,600 $8,231
149,923
kWh
- - $(-4,800.0) -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,865 $3,865 $2,555
46,531
kWh
$310
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $728,680 $232,782 $46,219
841,872
kWh
$3,433
-
kW-mo/yr
$122,402
-
MMBtu
$101,834 $454,792
TOTAL IMPLEMENTED $146,773 $97,015 $36,706
668,592
kWh
$3,433
-
kW-mo/yr
- $106,634 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs