Assessment Year | 2015 |
---|---|
Principal Product | Titanium Castings |
NAICS | 331410: Nonferrous Metal (except Aluminum) Smelting and Refining |
SIC | 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
130,000
ft2
|
Annual Production | 1,125,686
units
|
Production Hrs. Annual | 7,478
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $835,179 | 15,212,736 |
kWh
|
$0.055 |
Electricity Demand | $169,988 | 34,691 |
kW-mo/yr
|
$4.90 |
Electricity Fees | $2,737 | - |
|
- |
Natural Gas | $184,621 | 37,740 |
MMBtu
|
$4.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $728,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $146,773 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.1191: Change procedures / equipment / operating conditions | $456,074 | $95,650 |
$1,282
23,357
kWh
|
- | - | - | $454,792 | |
02 | 2.1116: Improve combustion control capability | $122,402 | $38,517 | - | - |
$122,402
-
MMBtu
|
- | - | |
03 | 3.1161: Eliminate/reduce an operation | $106,634 | $72,750 | - | - | - | $106,634 | - | |
04 | 2.4224: Upgrade controls on compressors | $37,274 | $20,400 |
$34,151
622,061
kWh
|
$3,123
-
kW-mo/yr
|
- | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $3,431 | $1,600 |
$8,231
149,923
kWh
|
- | - | $(-4,800.0) | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,865 | $3,865 |
$2,555
46,531
kWh
|
$310
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $728,680 | $232,782 |
$46,219
841,872
kWh
|
$3,433
-
kW-mo/yr
|
$122,402
-
MMBtu
|
$101,834 | $454,792 | ||
TOTAL IMPLEMENTED | $146,773 | $97,015 |
$36,706
668,592
kWh
|
$3,433
-
kW-mo/yr
|
- | $106,634 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs