ITAC Assessment: OR0641
ITAC logo
ITAC Assessment: OR0641
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Baked Goods
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 130,000
ft2
Annual Production 52,046,000
lb
Production Hrs. Annual 5,616
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,062,103 19,928,372
kWh
Electricity Demand $143,344 35,792
kW-mo/yr
Electricity Fees $53,214 -
Natural Gas $312,657 58,866
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,216 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1113: Reduce combustion air flow to optimum $17,076 $2,794 - - $17,076
-
MMBtu
-
02 2.1243: Use heat from boiler blowdown to preheat boiler feed water $13,580 $8,760 - - $13,580
-
MMBtu
-
03 2.1113: Reduce combustion air flow to optimum $5,509 $8,500 - - $5,509
-
MMBtu
-
04 2.4112: Install soft-start to eliminate nuisance trips $1,470 $1,577 $1,470
26,780
kWh
- - -
05 2.4133: Use most efficient type of electric motors $581 $1,121 $602
10,971
kWh
$166
-
kW-mo/yr
- $(-187.0)
TOTAL RECOMMENDED $38,216 $22,752 $2,072
37,751
kWh
$166
-
kW-mo/yr
$36,165
-
MMBtu
$(-187.0)
TOTAL IMPLEMENTED $32,707 $14,252 $2,072
37,751
kWh
$166
-
kW-mo/yr
$30,656
-
MMBtu
$(-187.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs