| Assessment Year | 2014 |
|---|---|
| Principal Product | Beer |
| NAICS | 312120: Breweries |
| SIC | 2082: Malt Beverages |
| Sales Range | $100 M to 500M |
| # of Employees | 150 |
| Plant Area |
125,000
ft2
|
| Annual Production | 500,000
bbl
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $327,714 | 5,554,200 |
kWh
|
$0.059 |
| Electricity Demand | $103,276 | 13,380 |
kW-mo/yr
|
$7.72 |
| Electricity Fees | $31,526 | - |
|
- |
| Natural Gas | $286,762 | 57,287 |
MMBtu
|
$5.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $831,669 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,708 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1116: Improve combustion control capability | $31,057 | $7,123 |
$11,700
201,138
kWh
|
- |
$19,357
-
MMBtu
|
- | - | - | |
| 02 | 2.4321: Upgrade obsolete equipment | $55,473 | $50,000 |
$(-2,499.0)
(-42,953)
kWh
|
$(-590.0)
-
kW-mo/yr
|
- |
$42,446
-
Tgal
|
- |
$16,116
-
Tgal
|
|
| 03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $5,708 | $7,000 |
$5,708
66,374
kWh
|
- | - | - | - | - | |
| 04 | 2.1392: Replace purchased steam with other energy source | $27,166 | $37,500 |
$(-780.0)
(-13,407)
kWh
|
$(-185.0)
-
kW-mo/yr
|
$28,131
-
MMBtu
|
- | - | - | |
| 05 | 3.4131: Minimize contamination of water before treatment | $712,265 | $3,300,000 |
$(-2,152.0)
(-36,987)
kWh
|
- | - |
$764,417
-
Tgal
|
$(-50,000.0) | - | |
| TOTAL RECOMMENDED | $831,669 | $3,401,623 |
$11,977
174,165
kWh
|
$(-775.0)
-
kW-mo/yr
|
$47,488
-
MMBtu
|
$806,863
-
Tgal
|
$(-50,000.0) |
$16,116
-
Tgal
|
||
| TOTAL IMPLEMENTED | $5,708 | $7,000 |
$5,708
66,374
kWh
|
- | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs