Assessment Year | 2014 |
---|---|
Principal Product | Beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $100 M to 500M |
# of Employees | 150 |
Plant Area |
125,000
ft2
|
Annual Production | 500,000
bbl
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $327,714 | 5,554,200 |
kWh
|
$0.059 |
Electricity Demand | $103,276 | 13,380 |
kW-mo/yr
|
$7.72 |
Electricity Fees | $31,526 | - |
|
- |
Natural Gas | $286,762 | 57,287 |
MMBtu
|
$5.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $831,669 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,708 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1116: Improve combustion control capability | $31,057 | $7,123 |
$11,700
201,138
kWh
|
- |
$19,357
-
MMBtu
|
- | - | - | |
02 | 2.4321: Upgrade obsolete equipment | $55,473 | $50,000 |
$(-2,499.0)
(-42,953)
kWh
|
$(-590.0)
-
kW-mo/yr
|
- |
$42,446
-
Tgal
|
- |
$16,116
-
Tgal
|
|
03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $5,708 | $7,000 |
$5,708
66,374
kWh
|
- | - | - | - | - | |
04 | 2.1392: Replace purchased steam with other energy source | $27,166 | $37,500 |
$(-780.0)
(-13,407)
kWh
|
$(-185.0)
-
kW-mo/yr
|
$28,131
-
MMBtu
|
- | - | - | |
05 | 3.4131: Minimize contamination of water before treatment | $712,265 | $3,300,000 |
$(-2,152.0)
(-36,987)
kWh
|
- | - |
$764,417
-
Tgal
|
$(-50,000.0) | - | |
TOTAL RECOMMENDED | $831,669 | $3,401,623 |
$11,977
174,165
kWh
|
$(-775.0)
-
kW-mo/yr
|
$47,488
-
MMBtu
|
$806,863
-
Tgal
|
$(-50,000.0) |
$16,116
-
Tgal
|
||
TOTAL IMPLEMENTED | $5,708 | $7,000 |
$5,708
66,374
kWh
|
- | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs