ITAC Assessment: OR0636
ITAC logo
ITAC Assessment: OR0636
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 125,000
ft2
Annual Production 500,000
bbl
Production Hrs. Annual 7,488
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $327,714 5,554,200
kWh
Electricity Demand $103,276 13,380
kW-mo/yr
Electricity Fees $31,526 -
Natural Gas $286,762 57,287
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $831,669 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,708

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.1116: Improve combustion control capability $31,057 $7,123 $11,700
201,138
kWh
- $19,357
-
MMBtu
- - -
02 2.4321: Upgrade obsolete equipment $55,473 $50,000 $(-2,499.0)
(-42,953)
kWh
$(-590.0)
-
kW-mo/yr
- $42,446
-
Tgal
- $16,116
-
Tgal
03 2.2621: Modify refrigeration system to operate at a lower pressure $5,708 $7,000 $5,708
66,374
kWh
- - - - -
04 2.1392: Replace purchased steam with other energy source $27,166 $37,500 $(-780.0)
(-13,407)
kWh
$(-185.0)
-
kW-mo/yr
$28,131
-
MMBtu
- - -
05 3.4131: Minimize contamination of water before treatment $712,265 $3,300,000 $(-2,152.0)
(-36,987)
kWh
- - $764,417
-
Tgal
$(-50,000.0) -
TOTAL RECOMMENDED $831,669 $3,401,623 $11,977
174,165
kWh
$(-775.0)
-
kW-mo/yr
$47,488
-
MMBtu
$806,863
-
Tgal
$(-50,000.0) $16,116
-
Tgal
TOTAL IMPLEMENTED $5,708 $7,000 $5,708
66,374
kWh
- - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs