ITAC Assessment: OR0631
ITAC logo
ITAC Assessment: OR0631
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Cases Distributed Annually
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 305,000
ft2
Annual Production 22,672,500
pieces
Production Hrs. Annual 5,800
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $614,317 10,701,440
kWh
Electricity Demand $309,381 27,284
kW-mo/yr
Electricity Fees $65,746 -
Natural Gas $457,972 64,237
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,895 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,727

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $11,360 $250 $11,360
190,348
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,168 $5,544 $4,818
80,736
kWh
$1,350
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $1,567 $1,634 $1,292
21,641
kWh
$547
-
kW-mo/yr
- $(-272.0)
04 2.2136: Install / repair insulation on steam lines $800 $417 - - $800
-
MMBtu
-
TOTAL RECOMMENDED $19,895 $7,845 $17,470
292,725
kWh
$1,897
-
kW-mo/yr
$800
-
MMBtu
$(-272.0)
TOTAL IMPLEMENTED $13,727 $2,301 $12,652
211,989
kWh
$547
-
kW-mo/yr
$800
-
MMBtu
$(-272.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs