Assessment Year | 2014 |
---|---|
Principal Product | Bus Components |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 114 |
Plant Area |
97,250
ft2
|
Annual Production | 16,354
units
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $325,863 | 4,882,599 |
kWh
|
$0.067 |
Electricity Demand | $19,843 | 10,229 |
kW-mo/yr
|
$1.94 |
Electricity Fees | $4,933 | - |
|
- |
Natural Gas | $162,582 | 19,749 |
MMBtu
|
$8.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,583 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,509 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $4,792 | $500 |
$4,529
68,112
kWh
|
$263
-
kW-mo/yr
|
- | - | - | |
02 | 2.1133: Adjust burners for efficient operation | $1,503 | $1,500 | - | - |
$3,003
-
MMBtu
|
- | $(-1,500.0) | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,588 | $175,982 |
$21,303
320,348
kWh
|
$1,650
-
kW-mo/yr
|
- | $455 | $6,180 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,626 | $500 |
$1,564
23,513
kWh
|
$62
-
kW-mo/yr
|
- | - | - | |
05 | 2.2437: Recover waste heat from equipment | $1,074 | $6,924 | - | - |
$1,074
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $38,583 | $185,406 |
$27,396
411,973
kWh
|
$1,975
-
kW-mo/yr
|
$4,077
-
MMBtu
|
$455 | $4,680 | ||
TOTAL IMPLEMENTED | $37,509 | $178,482 |
$27,396
411,973
kWh
|
$1,975
-
kW-mo/yr
|
$3,003
-
MMBtu
|
$455 | $4,680 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs