ITAC Assessment: OR0624
ITAC logo
ITAC Assessment: OR0624
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Woolen Textiles
NAICS 313210: Broadwoven Fabric Mills
SIC 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing)
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area 300,000
ft2
Annual Production 1,500,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $387,449 8,282,700
kWh
Electricity Demand $128,747 21,534
kW-mo/yr
Electricity Fees $33,516 -
Natural Gas $448,594 84,908
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,127

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4224: Upgrade controls on compressors $8,251 $22,500 $6,688
135,818
kWh
$1,563
-
kW-mo/yr
- - -
02 2.6242: Minimize operation of equipment maintained in standby condition $2,193 $468 $2,193
44,534
kWh
- - - -
03 2.2121: Increase amount of condensate returned $12,766 $6,839 - - $12,766
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,361 $30,178 $2,436
49,473
kWh
$919
-
kW-mo/yr
- $146 $860
TOTAL RECOMMENDED $27,571 $59,985 $11,317
229,825
kWh
$2,482
-
kW-mo/yr
$12,766
-
MMBtu
$146 $860
TOTAL IMPLEMENTED $17,127 $37,017 $2,436
49,473
kWh
$919
-
kW-mo/yr
$12,766
-
MMBtu
$146 $860
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs