ITAC Assessment: OR0623
ITAC logo
ITAC Assessment: OR0623
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Softwood Veneer
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 400,000
ft2
Annual Production 352,679
units
Production Hrs. Annual 6,800
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,028 1,532,581
kWh
Electricity Demand $58,968 7,569
kW-mo/yr
Electricity Fees $9,475 -
LPG $289,925 14,262
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,492 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 4.454: Modify startup/shutdown times $7,500 $700 $7,500
140,377
kWh
02 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $3,199 $1,260 $3,199
59,882
kWh
03 2.6218: Turn off equipment when not in use $6,693 $1,500 $6,693
125,256
kWh
04 4.454: Modify startup/shutdown times $2,617 $2,500 $2,617
48,980
kWh
05 2.6218: Turn off equipment when not in use $8,023 $9,452 $8,023
150,159
kWh
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,460 $11,957 $9,460
177,148
kWh
TOTAL RECOMMENDED $37,492 $27,369 $37,492
701,802
kWh
TOTAL IMPLEMENTED $6,693 $1,500 $6,693
125,256
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs