ITAC Assessment: OR0605
ITAC logo
ITAC Assessment: OR0605
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Treated Wastewater
NAICS 924110: Administration of Air and Water Resource and Solid Waste Management Programs
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 9
Plant Area 165,700
ft2
Annual Production 1,900
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,655 2,626,080
kWh
Electricity Demand $34,727 4,695
kW-mo/yr
Electricity Fees $2,980 -
Natural Gas $5,021 654
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,761 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,593

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4323: Use optimum size and capacity equipment $14,401 $11,850 $11,450
176,600
kWh
$2,201
-
kW-mo/yr
$750 -
02 2.4323: Use optimum size and capacity equipment $29,593 $32,655 $24,899
385,440
kWh
$3,934
-
kW-mo/yr
- $760
03 4.132: Purchase new equipment to reduce material use / cost $23,767 $234,289 $1,230
19,037
kWh
$1,148
-
kW-mo/yr
$11,750 $9,639
TOTAL RECOMMENDED $67,761 $278,794 $37,579
581,077
kWh
$7,283
-
kW-mo/yr
$12,500 $10,399
TOTAL IMPLEMENTED $29,593 $32,655 $24,899
385,440
kWh
$3,934
-
kW-mo/yr
- $760
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs