Assessment Year | 2013 |
---|---|
Principal Product | Sheet Metal Products and Powder Coating |
NAICS | 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
32,500
ft2
|
Annual Production | 190,000
pieces
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $97,105 | 1,124,400 |
kWh
|
$0.086 |
Natural Gas | $136,429 | 11,770 |
MMBtu
|
$11.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $87,074 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,824 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $4,114 | - |
$29,122
-
kWh
|
$(-25,910.0)
-
kW-mo/yr
|
$902 | - | - | - | - | - | |
02 | 2.1116: Improve combustion control capability | $10,408 | $3,874 |
$1,504
17,512
kWh
|
- | - |
$8,904
-
MMBtu
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,167 | $2,000 |
$1,167
13,589
kWh
|
- | - | - | - | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,338 | $1,616 |
$1,083
12,617
kWh
|
- | - | - | - | - | $81 | $174 | |
05 | 4.111: Add equipment/ operators to reduce production bottleneck | $51,858 | $112,345 |
$858
10,621
kWh
|
- | - | - | - | $51,000 | - | - | |
06 | 2.4131: Size electric motors for peak operating efficiency | $6,546 | $5,306 |
$5,510
64,175
kWh
|
- | - | - | - | - | - | $1,036 | |
07 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $9,479 | $35,500 |
$(-4,407.0)
(-51,330)
kWh
|
- | - | - |
$13,152
-
MMBtu
|
- | $734 | - | |
08 | 2.1221: Replace obsolete burners with more efficient ones | $2,164 | $8,104 | - | - | - |
$2,164
-
MMBtu
|
- | - | - | - | |
TOTAL RECOMMENDED | $87,074 | $168,745 |
$34,837
67,184
kWh
|
$(-25,910.0)
-
kW-mo/yr
|
$902 |
$11,068
-
MMBtu
|
$13,152
-
MMBtu
|
$51,000 | $815 | $1,210 | ||
TOTAL IMPLEMENTED | $12,824 | $13,410 |
$34,632
64,175
kWh
|
$(-25,910.0)
-
kW-mo/yr
|
$902 |
$2,164
-
MMBtu
|
- | - | - | $1,036 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs