ITAC Assessment: OR0599
ITAC logo
ITAC Assessment: OR0599
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Fish
NAICS 424420: Packaged Frozen Food Merchant Wholesalers
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 60,000
ft2
Annual Production 32,000,000
units
Production Hrs. Annual 6,300
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,258 2,323,716
kWh
Electricity Demand $21,646 5,582
kW-mo/yr
Electricity Fees $9,662 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,714 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,328

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,611 $12,467 $7,856
117,858
kWh
$933
-
kW-mo/yr
- - $91 $(-1,269.0)
02 4.441: Install automatic packing equipment $35,308 - $(-756.0)
(-11,539)
kWh
- - $36,064 - -
03 2.7232: Replace existing hvac unit with high efficiency model $1,422 - $(-1,089.0)
(-16,489)
kWh
$(-754.0)
-
kW-mo/yr
$3,265
-
MMBtu
- - -
04 2.2621: Modify refrigeration system to operate at a lower pressure $1,409 - $1,409
21,346
kWh
- - - - -
05 2.9114: Use solar heat to make electricty $1,964 $17,576 $1,904
28,827
kWh
$60
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $47,714 $30,043 $9,324
140,003
kWh
$239
-
kW-mo/yr
$3,265
-
MMBtu
$36,064 $91 $(-1,269.0)
TOTAL IMPLEMENTED $44,328 $12,467 $8,509
127,665
kWh
$933
-
kW-mo/yr
- $36,064 $91 $(-1,269.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs