Assessment Year | 2012 |
---|---|
Principal Product | Vinyl Windows |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
115,000
ft2
|
Annual Production | 8,000
units
|
Production Hrs. Annual | 3,060
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $122,337 | 2,434,500 |
kWh
|
$0.050 |
Electricity Demand | $43,328 | 7,343 |
kW-mo/yr
|
$5.90 |
Natural Gas | $15,182 | 1,774 |
MMBtu
|
$8.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,164 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,751 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 3.1121: Use more efficient adhesive applicators | $72,379 | $43,800 |
$(-51.0)
(-1,004)
kWh
|
$(-23.0)
-
kW-mo/yr
|
$72,453
-
lb
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,751 | $4,751 |
$3,136
62,272
kWh
|
$615
-
kW-mo/yr
|
- | |
03 | 2.2524: Avoid cooling of process streams or materials that must subsequently be heated | $2,514 | $900 |
$2,514
49,920
kWh
|
- | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $930 | $2,250 |
$930
18,457
kWh
|
- | - | |
05 | 4.111: Add equipment/ operators to reduce production bottleneck | $8,590 | $34,684 |
$6,511
129,254
kWh
|
$2,079
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $88,164 | $86,385 |
$13,040
258,899
kWh
|
$2,671
-
kW-mo/yr
|
$72,453
-
lb
|
||
TOTAL IMPLEMENTED | $3,751 | $4,751 |
$3,136
62,272
kWh
|
$615
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs