ITAC Assessment: OR0591
ITAC logo
ITAC Assessment: OR0591
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Beer/Ales
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 113,561
ft2
Annual Production 7,487
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,858 3,829,525
kWh
Electricity Demand $52,854 8,414
kW-mo/yr
Natural Gas $193,480 36,297
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,016,744 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $922,923

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $920,649 $25,909 $(-10,851.0)
(-181,793)
kWh
- - - $931,500
02 2.2437: Recover waste heat from equipment $93,821 $27,749 - - - - $93,821
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,274 $6,968 $662
11,097
kWh
$240
-
kW-mo/yr
$990 $382 -
TOTAL RECOMMENDED $1,016,744 $60,626 $(-10,189.0)
(-170,696)
kWh
$240
-
kW-mo/yr
$990 $382 $1,025,321
TOTAL IMPLEMENTED $922,923 $32,877 $(-10,189.0)
(-170,696)
kWh
$240
-
kW-mo/yr
$990 $382 $931,500
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs