ITAC Assessment: OR0567
ITAC logo
ITAC Assessment: OR0567
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Dry Veneer
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 110,000
ft2
Annual Production 10,017,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,679 4,517,200
kWh
Electricity Demand $57,119 11,516
kW-mo/yr
Natural Gas $416,494 83,996
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,248

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 4.114: Add/modify equipment to improve drying process $2,000 $1,510 - - - $90 - $1,910
02 2.7243: Improve air circulation with destratification fans / other methods $8,491 $8,300 $6,663
140,908
kWh
$1,828
-
kW-mo/yr
- - - -
03 2.7135: Install occupancy sensors $878 $737 $606
12,826
kWh
- - - $272 -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,800 $6,700 $2,800
59,200
kWh
- - - - -
05 2.4133: Use most efficient type of electric motors $12,000 $5,580 $9,068
182,711
kWh
$2,932
-
kW-mo/yr
- - - -
06 2.2511: Insulate bare equipment $1,248 $2,547 - - $1,248
-
MMBtu
- - -
07 3.1161: Eliminate/reduce an operation $17,603 $2,480 $17,603
372,284
kWh
- - - - -
TOTAL RECOMMENDED $45,020 $27,854 $36,740
767,929
kWh
$4,760
-
kW-mo/yr
$1,248
-
MMBtu
$90 $272 $1,910
TOTAL IMPLEMENTED $15,248 $9,637 $9,068
182,711
kWh
$2,932
-
kW-mo/yr
$1,248
-
MMBtu
$90 - $1,910
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs