ITAC Assessment: OR0566
ITAC logo
ITAC Assessment: OR0566
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Manufactured Homes
NAICS 321992: Prefabricated Wood Building Manufacturing
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 150,000
ft2
Annual Production 520
pieces
Production Hrs. Annual 2,150
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,605 1,080,081
kWh
Electricity Demand $21,980 4,544
kW-mo/yr
Electricity Fees $4,585 -
Natural Gas $6,180 611
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,260

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7111: Reduce illumination to minimum necessary levels $3,230 $635 $3,230
46,400
kWh
02 2.7135: Install occupancy sensors $4,340 $9,990 $4,340
45,600
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,690 $1,690 $1,690
17,161
kWh
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $8,620 $37,500 $8,620
124,000
kWh
05 2.9114: Use solar heat to make electricty $15,200 $146,000 $15,200
198,000
kWh
TOTAL RECOMMENDED $33,080 $195,815 $33,080
431,161
kWh
TOTAL IMPLEMENTED $9,260 $12,315 $9,260
109,161
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs