ITAC Assessment: OR0529
ITAC logo
ITAC Assessment: OR0529
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Reconditioned Barrels
NAICS 332439: Other Metal Container Manufacturing
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 31,605
ft2
Annual Production 234,000
pieces
Production Hrs. Annual 2,920
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,316 552,803
kWh
Electricity Demand $15,059 2,748
kW-mo/yr
Electricity Fees $7,054 -
Natural Gas $197,925 199,924
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,727 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
01 4.131: Modify process to reduce material use/cost $8,800 $4,900 - - $8,800
02 2.2414: Use waste heat from hot flue gases to preheat $12,400 $17,900 - $12,400
-
MMBtu
-
03 2.1111: Control pressure on steamer operations $11,760 $1,000 - $11,760
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,767 $4,515 $2,767
42,640
kWh
- -
TOTAL RECOMMENDED $35,727 $28,315 $2,767
42,640
kWh
$24,160
-
MMBtu
$8,800
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs