ITAC Assessment: OR0518
ITAC logo
ITAC Assessment: OR0518
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product fluid milk
NAICS 424430: Dairy Product (except Dried or Canned) Merchant Wholesalers
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 199
Plant Area 70,000
ft2
Annual Production 15,600
Tgal
Production Hrs. Annual 4,600
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,277 2,001,921
kWh
Electricity Demand $42,221 14,447
kW-mo/yr
Electricity Fees $2,262 -
Natural Gas $193,288 18,573
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,020

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.4131: Minimize contamination of water before treatment $51,600 $120,000 - $51,600
-
Tgal
- -
02 2.7135: Install occupancy sensors $1,020 $2,050 $610
15
kWh
- $80 $330
03 2.2511: Insulate bare equipment $840 $4,100 $840
19,540
kWh
- - -
TOTAL RECOMMENDED $53,460 $126,150 $1,450
19,555
kWh
$51,600
-
Tgal
$80 $330
TOTAL IMPLEMENTED $1,020 $2,050 $610
15
kWh
- $80 $330
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs