ITAC Assessment: OR0517
ITAC logo
ITAC Assessment: OR0517
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Lubricants
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range $50
M
to 100
M
# of Employees 24
Plant Area 51,500
ft2
Annual Production 19,500
Tgal
Production Hrs. Annual 4,160
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,548 3,595,782
kWh
Electricity Demand $63,000 11,175
kW-mo/yr
Fuel Oil #1 $593,181 675,664
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $256,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,090

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Fuel Oil #1 Savings Water Consumption Savings
01 2.2511: Insulate bare equipment $163,500 $81,700 - - $163,500
-
MMBtu
-
02 2.2511: Insulate bare equipment $35,400 $7,000 - - $35,400
-
MMBtu
-
03 4.721: Initiate a program to acquire iso certification $18,000 - - - - $18,000
-
Tgal
04 2.1231: Establish burner maintenance schedule for boilers $17,200 $500 - - $17,200
-
MMBtu
-
05 3.2176: Increase use of automation $10,400 $10,000 - - $10,400
-
MMBtu
-
06 2.2511: Insulate bare equipment $6,100 $3,750 - - $6,100
-
MMBtu
-
07 2.2121: Increase amount of condensate returned $3,460 $10,350 - - $3,460
-
MMBtu
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $930 - $930
42
kWh
- - -
09 2.3212: Optimize plant power factor $1,470 - - $1,470 - -
TOTAL RECOMMENDED $256,460 $113,300 $930
42
kWh
$1,470 $236,060
-
MMBtu
$18,000
-
Tgal
TOTAL IMPLEMENTED $81,090 $21,600 $930
42
kWh
- $62,160
-
MMBtu
$18,000
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Fuel Oil #1 Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs