Assessment Year | 2007 |
---|---|
Principal Product | Lubricants |
NAICS | 324191: Petroleum Lubricating Oil and Grease Manufacturing |
SIC | 2992: Lubricating Oils and Greases |
Sales Range | $50 M to 100M |
# of Employees | 24 |
Plant Area |
51,500
ft2
|
Annual Production | 19,500
Tgal
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $294,548 | 3,595,782 |
kWh
|
$0.082 |
Electricity Demand | $63,000 | 11,175 |
kW-mo/yr
|
$5.64 |
Fuel Oil #1 | $593,181 | 675,664 |
MMBtu
|
$0.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $256,460 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $81,090 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Fuel Oil #1 Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $163,500 | $81,700 | - | - |
$163,500
-
MMBtu
|
- | |
02 | 2.2511: Insulate bare equipment | $35,400 | $7,000 | - | - |
$35,400
-
MMBtu
|
- | |
03 | 4.721: Initiate a program to acquire iso certification | $18,000 | - | - | - | - |
$18,000
-
Tgal
|
|
04 | 2.1231: Establish burner maintenance schedule for boilers | $17,200 | $500 | - | - |
$17,200
-
MMBtu
|
- | |
05 | 3.2176: Increase use of automation | $10,400 | $10,000 | - | - |
$10,400
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $6,100 | $3,750 | - | - |
$6,100
-
MMBtu
|
- | |
07 | 2.2121: Increase amount of condensate returned | $3,460 | $10,350 | - | - |
$3,460
-
MMBtu
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $930 | - |
$930
42
kWh
|
- | - | - | |
09 | 2.3212: Optimize plant power factor | $1,470 | - | - | $1,470 | - | - | |
TOTAL RECOMMENDED | $256,460 | $113,300 |
$930
42
kWh
|
$1,470 |
$236,060
-
MMBtu
|
$18,000
-
Tgal
|
||
TOTAL IMPLEMENTED | $81,090 | $21,600 |
$930
42
kWh
|
- |
$62,160
-
MMBtu
|
$18,000
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Fuel Oil #1 Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs