ITAC Assessment: OR0502
ITAC logo
ITAC Assessment: OR0502
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Dimensional Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 1,742,400
ft2
Annual Production 55,000,000
units
Production Hrs. Annual 4,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,000 8,001,748
kWh
Electricity Demand $123,180 27,323
kW-mo/yr
Electricity Fees $15 -
Natural Gas $201,943 235,083
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,109,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,180

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Increase in Production Savings
01 4.453: Reschedule breaks to allow for continuous production $5,052,000 - - - - $5,052,000
02 2.4112: Install soft-start to eliminate nuisance trips $5,700 - $5,700
160,000
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,300 $6,300 $5,100
143,000
kWh
$1,200
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $18,300 $27,500 $16,000
447
kWh
$2,300
-
kW-mo/yr
- -
05 2.3212: Optimize plant power factor $12,600 $48,600 - - $12,600 -
06 2.4133: Use most efficient type of electric motors $14,280 $72,900 $10,300
288,290
kWh
$3,980
-
kW-mo/yr
- -
TOTAL RECOMMENDED $5,109,180 $155,300 $37,100
591,737
kWh
$7,480
-
kW-mo/yr
$12,600 $5,052,000
TOTAL IMPLEMENTED $57,180 $155,300 $37,100
591,737
kWh
$7,480
-
kW-mo/yr
$12,600 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs