ITAC Assessment: OR0458
ITAC logo
ITAC Assessment: OR0458
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Plastic Food Containers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 140,000
ft2
Annual Production 350,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,396 3,015,120
kWh
Electricity Demand $46,902 89,340
kW-mo/yr
Electricity Fees $864 -
Natural Gas $53,451 39,061
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Product Savings
01 4.426: Modify workload $60,800 $480 - - - $60,800
02 2.3212: Optimize plant power factor $9,440 $7,400 - - $9,440 -
03 2.7111: Reduce illumination to minimum necessary levels $7,200 $4,600 $7,200
117,000
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,300 $6,000 $5,100
121,000
kWh
$1,200
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,800 - $2,300
56,000
kWh
$500
-
kW-mo/yr
- -
06 2.4133: Use most efficient type of electric motors $4,880 $3,000 $3,820
91,000
kWh
$1,060
-
kW-mo/yr
- -
TOTAL RECOMMENDED $91,420 $21,480 $18,420
385,000
kWh
$2,760
-
kW-mo/yr
$9,440 $60,800
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs