Assessment Year | 2004 |
---|---|
Principal Product | Plastic Food Containers |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
140,000
ft2
|
Annual Production | 350,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $126,396 | 3,015,120 |
kWh
|
$0.042 |
Electricity Demand | $46,902 | 89,340 |
kW-mo/yr
|
$0.52 |
Electricity Fees | $864 | - |
|
- |
Natural Gas | $53,451 | 39,061 |
MMBtu
|
$1.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $91,420 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.426: Modify workload | $60,800 | $480 | - | - | - | $60,800 | |
02 | 2.3212: Optimize plant power factor | $9,440 | $7,400 | - | - | $9,440 | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $7,200 | $4,600 |
$7,200
117,000
kWh
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,300 | $6,000 |
$5,100
121,000
kWh
|
$1,200
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,800 | - |
$2,300
56,000
kWh
|
$500
-
kW-mo/yr
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $4,880 | $3,000 |
$3,820
91,000
kWh
|
$1,060
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $91,420 | $21,480 |
$18,420
385,000
kWh
|
$2,760
-
kW-mo/yr
|
$9,440 | $60,800 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs