ITAC Assessment: OR0449
ITAC logo
ITAC Assessment: OR0449
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Manufactured Homes
NAICS 321992: Prefabricated Wood Building Manufacturing
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 120,000
ft2
Annual Production 1,018
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,953 952,270
kWh
Electricity Fees $3,426 -
Natural Gas $33,874 4,321
MMBtu
LPG $13,597 827
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,930

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,830 $8,000 $7,830
124,000
kWh
- -
02 2.4133: Use most efficient type of electric motors $1,100 $2,600 $1,100
18,200
kWh
- -
03 4.423: Move product using mechanical means $88,440 $400 - $64,800 $23,640
TOTAL RECOMMENDED $97,370 $11,000 $8,930
142,200
kWh
$64,800 $23,640
TOTAL IMPLEMENTED $8,930 $10,600 $8,930
142,200
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs