ITAC Assessment: OR0444
ITAC logo
ITAC Assessment: OR0444
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Old Growth Dimensional Lumber
NAICS 321918: Other Millwork (including Flooring)
SIC 2412:
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area
n/a
Annual Production 7,500
thousand feet
Production Hrs. Annual 2,375
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,875 2,164,660
kWh
Electricity Demand $54,765 8,964
kW-mo/yr
Electricity Fees $1,330 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,025,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $980,020

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $967,810 $181,200 - - $(-157,190.0) - $1,125,000
02 4.132: Purchase new equipment to reduce material use / cost $30,800 $2,000 $550
12,460
kWh
$250
-
kW-mo/yr
- $30,000 -
03 2.4133: Use most efficient type of electric motors $12,210 $8,170 $7,060
160,000
kWh
$5,150
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,600 $18,610 $14,600
330,000
kWh
- - - -
TOTAL RECOMMENDED $1,025,420 $209,980 $22,210
502,460
kWh
$5,400
-
kW-mo/yr
$(-157,190.0) $30,000 $1,125,000
TOTAL IMPLEMENTED $980,020 $189,370 $7,060
160,000
kWh
$5,150
-
kW-mo/yr
$(-157,190.0) - $1,125,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs