Assessment Year | 2003 |
---|---|
Principal Product | Asphalt shingle coatings |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $1 M to 5M |
# of Employees | 14 |
Plant Area |
n/a
|
Annual Production | 157,334
ton
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $154,860 | 3,703,945 |
kWh
|
$0.042 |
Electricity Demand | $60,501 | 148,128 |
kW-mo/yr
|
$0.41 |
Electricity Fees | $2,947 | - |
|
- |
Natural Gas | $765,236 | 167,370 |
MMBtu
|
$4.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,862 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,830 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2211: Use optimum temperature | $7,341 | $1,900 |
$5,592
129,210
kWh
|
$1,749
-
kW-mo/yr
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $17,830 | $54,571 |
$15,200
351,530
kWh
|
$2,630
-
kW-mo/yr
|
- | |
03 | 2.6125: Keep equipment clean | $5,590 | $4,000 | - | - |
$5,590
-
MMBtu
|
|
04 | 2.2121: Increase amount of condensate returned | $2,860 | $5,500 | - | - |
$2,860
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,241 | $7,250 |
$1,061
24,513
kWh
|
$180
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $34,862 | $73,221 |
$21,853
505,253
kWh
|
$4,559
-
kW-mo/yr
|
$8,450
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,830 | $54,571 |
$15,200
351,530
kWh
|
$2,630
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs