ITAC Assessment: OR0431
ITAC logo
ITAC Assessment: OR0431
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Asphalt shingle coatings
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area
n/a
Annual Production 157,334
ton
Production Hrs. Annual 8,400
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,860 3,703,945
kWh
Electricity Demand $60,501 148,128
kW-mo/yr
Electricity Fees $2,947 -
Natural Gas $765,236 167,370
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,862 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2211: Use optimum temperature $7,341 $1,900 $5,592
129,210
kWh
$1,749
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $17,830 $54,571 $15,200
351,530
kWh
$2,630
-
kW-mo/yr
-
03 2.6125: Keep equipment clean $5,590 $4,000 - - $5,590
-
MMBtu
04 2.2121: Increase amount of condensate returned $2,860 $5,500 - - $2,860
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,241 $7,250 $1,061
24,513
kWh
$180
-
kW-mo/yr
-
TOTAL RECOMMENDED $34,862 $73,221 $21,853
505,253
kWh
$4,559
-
kW-mo/yr
$8,450
-
MMBtu
TOTAL IMPLEMENTED $17,830 $54,571 $15,200
351,530
kWh
$2,630
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs