| Assessment Year | 2003 |
|---|---|
| Principal Product | Piping and Fittings |
| NAICS |
n/a
|
| SIC | 3523: Farm Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 95 |
| Plant Area |
n/a
|
| Annual Production | 4,436,430
units
|
| Production Hrs. Annual | 2,040
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $57,855 | 1,864,880 |
kWh
|
$0.031 |
| Electricity Demand | $37,928 | 10,977 |
kW-mo/yr
|
$3.46 |
| Electricity Fees | $5,677 | - |
|
- |
| Natural Gas | $62,333 | 9,586 |
MMBtu
|
$6.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,264 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.8132: Use less toxic and volatile solvent substitutes | $13,080 | $43,350 | - | - | - | - |
$13,080
-
gal
|
|
| 02 | 2.4133: Use most efficient type of electric motors | $4,040 | $7,490 |
$2,250
58,300
kWh
|
$1,790
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,380 | $2,400 |
$1,450
37,689
kWh
|
$930
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4225: Install common header on compressors | $2,230 | $4,750 |
$2,090
54,256
kWh
|
$140
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,025 | $150 | - | - | - |
$1,025
-
MMBtu
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $509 | $1,800 |
$163
4,208
kWh
|
$207
-
kW-mo/yr
|
$139 | - | - | |
| TOTAL RECOMMENDED | $23,264 | $59,940 |
$5,953
154,453
kWh
|
$3,067
-
kW-mo/yr
|
$139 |
$1,025
-
MMBtu
|
$13,080
-
gal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs