ITAC Assessment: OR0429
ITAC logo
ITAC Assessment: OR0429
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Piping and Fittings
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area
n/a
Annual Production 4,436,430
units
Production Hrs. Annual 2,040
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,855 1,864,880
kWh
Electricity Demand $37,928 10,977
kW-mo/yr
Electricity Fees $5,677 -
Natural Gas $62,333 9,586
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,264 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 3.8132: Use less toxic and volatile solvent substitutes $13,080 $43,350 - - - - $13,080
-
gal
02 2.4133: Use most efficient type of electric motors $4,040 $7,490 $2,250
58,300
kWh
$1,790
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,380 $2,400 $1,450
37,689
kWh
$930
-
kW-mo/yr
- - -
04 2.4225: Install common header on compressors $2,230 $4,750 $2,090
54,256
kWh
$140
-
kW-mo/yr
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,025 $150 - - - $1,025
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $509 $1,800 $163
4,208
kWh
$207
-
kW-mo/yr
$139 - -
TOTAL RECOMMENDED $23,264 $59,940 $5,953
154,453
kWh
$3,067
-
kW-mo/yr
$139 $1,025
-
MMBtu
$13,080
-
gal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs