ITAC Assessment: OR0426
ITAC logo
ITAC Assessment: OR0426
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Hardwood Plywood
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $50
M
to 100
M
# of Employees 245
Plant Area
n/a
Annual Production 138,000,000
thousand feet
Production Hrs. Annual 0
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $313,582 9,005,814
kWh
Electricity Demand $56,946 16,656
kW-mo/yr
Electricity Fees $22,518 -
Natural Gas $1,152,518 261,156
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $165,429 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $153,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1133: Adjust burners for efficient operation $104,400 $150 - - $104,400
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $6,010 $135 $5,270
151,000
kWh
$740
-
kW-mo/yr
-
03 2.4131: Size electric motors for peak operating efficiency $1,720 $1,000 $1,320
37,800
kWh
$400
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $41,000 $41,000 $36,000
1,040,000
kWh
$5,000
-
kW-mo/yr
-
05 2.5125: Size air handling grills/ duct/s coils to minimize air resistance $9,530 $73,800 $8,010
230,000
kWh
$1,520
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,570 $6,080 $2,160
62,000
kWh
$410
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $199 - $167
4,800
kWh
$32
-
kW-mo/yr
-
TOTAL RECOMMENDED $165,429 $122,165 $52,927
1,525,600
kWh
$8,102
-
kW-mo/yr
$104,400
-
MMBtu
TOTAL IMPLEMENTED $153,329 $42,285 $42,757
1,233,600
kWh
$6,172
-
kW-mo/yr
$104,400
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs