ITAC Assessment: OR0424
ITAC logo
ITAC Assessment: OR0424
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product 2
NAICS
n/a
SIC 1041: Gold Ores
Sales Range $100
M
to 500
M
# of Employees 1,462
Plant Area
n/a
Annual Production 0
lb
Production Hrs. Annual 8,565
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,414,720 353,469,361
kWh
Electricity Demand $216,146 518,750
kW-mo/yr
Electricity Fees $6,000 -
Natural Gas $2,151,480 778,171
MMBtu
LPG $3,377,411 594,294
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,957,209 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $103,131

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1117: Relocate oven / furnace to more efficient location $577,590 $207,147 n/a - - $577,590
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $958,574 $1,727,000 $819,644
16,234,542
kWh
$138,930
-
kW-mo/yr
-
03 2.2449: Recover heat from exhausted steam, hot air or hot water $158,150 $118,500 n/a - - $158,150
-
MMBtu
04 2.4133: Use most efficient type of electric motors $119,700 $241,870 $104,000
2,105,788
kWh
$15,700
-
kW-mo/yr
-
05 4.111: Add equipment/ operators to reduce production bottleneck $69,350 $46,000 $60,810
1,246,590
kWh
$8,540
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $25,349 - $22,029
446,197
kWh
$3,320
-
kW-mo/yr
-
07 2.1133: Adjust burners for efficient operation $20,311 $1,000 - - $20,311
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,470 $12,200 $12,190
260,250
kWh
$1,280
-
kW-mo/yr
-
09 4.111: Add equipment/ operators to reduce production bottleneck $14,715 $45,000 - - $14,715
-
MMBtu
TOTAL RECOMMENDED $1,957,209 $2,398,717 $1,018,673
20,293,367
kWh
$167,770
-
kW-mo/yr
$770,766
-
MMBtu
TOTAL IMPLEMENTED $103,131 $59,200 $73,000
1,506,840
kWh
$9,820
-
kW-mo/yr
$20,311
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs