ITAC Assessment: OR0421
ITAC logo
ITAC Assessment: OR0421
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product silica sand
NAICS
n/a
SIC 1446: Industrial Sand
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 175,800
ton
Production Hrs. Annual 6,600
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,495 4,384,440
kWh
Electricity Demand $25,328 10,416
kW-mo/yr
Natural Gas $393,189 79,122
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,174 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,423

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1113: Reduce combustion air flow to optimum $31,000 $12,000 - - $31,000
-
MMBtu
-
02 2.7232: Replace existing hvac unit with high efficiency model $27,311 $32,500 $53,538
972,000
kWh
$6,600
-
kW-mo/yr
$(-32,827.0)
-
MMBtu
-
03 2.4322: Use or replace with energy efficient substitutes $3,751 $9,925 $3,411
61,932
kWh
$340
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,964 $5,062 $2,048
37,200
kWh
$205
-
kW-mo/yr
- $711
05 2.4133: Use most efficient type of electric motors $4,148 $6,309 $3,696
67,095
kWh
$452
-
kW-mo/yr
- -
TOTAL RECOMMENDED $69,174 $65,796 $62,693
1,138,227
kWh
$7,597
-
kW-mo/yr
$(-1,827.0)
-
MMBtu
$711
TOTAL IMPLEMENTED $65,423 $55,871 $59,282
1,076,295
kWh
$7,257
-
kW-mo/yr
$(-1,827.0)
-
MMBtu
$711
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs