Assessment Year | 2002 |
---|---|
Principal Product | Fluid Milk |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 41,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,174,122 | 19,536,138 |
kWh
|
$0.060 |
Electricity Demand | $16,264 | 487,908 |
kW-mo/yr
|
$0.033 |
Electricity Fees | $19,275 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $239,100 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.3128: Utilize other methods to remove contaminants | $140,000 | $790,000 |
$(-40,000.0)
(-655,000)
kWh
|
- | - |
$180,000
-
Tgal
|
|
02 | 2.2621: Modify refrigeration system to operate at a lower pressure | $19,366 | - |
$19,366
322,235
kWh
|
- | - | - | |
03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $13,308 | - |
$13,308
221,432
kWh
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,862 | $1,500 |
$6,800
113,000
kWh
|
$62
-
kW-mo/yr
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $32,840 | $32,942 |
$32,520
507,893
kWh
|
$320
-
kW-mo/yr
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $11,200 | - |
$11,100
184,794
kWh
|
$100
-
kW-mo/yr
|
- | - | |
07 | 2.3212: Optimize plant power factor | $15,524 | $38,000 | - | - | $15,524 | - | |
TOTAL RECOMMENDED | $239,100 | $862,442 |
$43,094
694,354
kWh
|
$482
-
kW-mo/yr
|
$15,524 |
$180,000
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs