ITAC Assessment: OR0414
ITAC logo
ITAC Assessment: OR0414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Frozen Yogurt
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 47
Plant Area
n/a
Annual Production 433
Tgal
Production Hrs. Annual 2,049
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,220 2,652,728
kWh
Electricity Demand $31,745 7,212
kW-mo/yr
Electricity Fees $1,021 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $789,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,502

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $657,000 $300,000 - - - - $657,000
02 4.441: Install automatic packing equipment $124,333 $56,075 $(-271.0)
(-7,176)
kWh
$(-196.0)
-
kW-mo/yr
- $124,800 -
03 4.441: Install automatic packing equipment $6,650 $9,075 $(-44.0)
(-1,178)
kWh
$(-96.0)
-
kW-mo/yr
- $6,790 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $852 - $558
14,800
kWh
$294
-
kW-mo/yr
- - -
05 2.3212: Optimize plant power factor $960 $2,700 - - $960 - -
TOTAL RECOMMENDED $789,795 $367,850 $243
6,446
kWh
$2
-
kW-mo/yr
$960 $131,590 $657,000
TOTAL IMPLEMENTED $7,502 $9,075 $514
13,622
kWh
$198
-
kW-mo/yr
- $6,790 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs