Assessment Year | 2002 |
---|---|
Principal Product | Doors and Cabnets |
NAICS |
n/a
|
SIC | 2434: Wood Kitchen Cabinets |
Sales Range | $10 M to 50M |
# of Employees | 121 |
Plant Area |
n/a
|
Annual Production | 2,000,000
thousand feet
|
Production Hrs. Annual | 4,886
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,664 | 2,999,000 |
kWh
|
$0.046 |
Electricity Demand | $62,698 | 12,696 |
kW-mo/yr
|
$4.94 |
Electricity Fees | $1,075 | - |
|
- |
Natural Gas | $24,492 | 2,623 |
MMBtu
|
$9.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,231 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,931 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4323: Use optimum size and capacity equipment | $23,700 | $62,500 |
$20,400
446,659
kWh
|
$3,300
-
kW-mo/yr
|
- | - | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $8,100 | $31,375 |
$6,100
134,941
kWh
|
$2,000
-
kW-mo/yr
|
- | - | - | |
03 | 2.5125: Size air handling grills/ duct/s coils to minimize air resistance | $16,900 | $33,800 |
$3,300
75,542
kWh
|
$1,000
-
kW-mo/yr
|
$3,300 | $9,300 | - | |
04 | 4.611: Begin a practice of predictive / preventative maintenance | $35,400 | $2,900 | - | - | - | - | $35,400 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,825 | $8,000 |
$5,015
182,365
kWh
|
$2,810
-
kW-mo/yr
|
- | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $2,306 | $4,970 |
$1,494
32,791
kWh
|
$812
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $94,231 | $143,545 |
$36,309
872,298
kWh
|
$9,922
-
kW-mo/yr
|
$3,300 | $9,300 | $35,400 | ||
TOTAL IMPLEMENTED | $41,931 | $106,845 |
$33,009
796,756
kWh
|
$8,922
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs