ITAC Assessment: OR0412
ITAC logo
ITAC Assessment: OR0412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Doors and Cabnets
NAICS
n/a
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 121
Plant Area
n/a
Annual Production 2,000,000
thousand feet
Production Hrs. Annual 4,886
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,664 2,999,000
kWh
Electricity Demand $62,698 12,696
kW-mo/yr
Electricity Fees $1,075 -
Natural Gas $24,492 2,623
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,231 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,931

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.4323: Use optimum size and capacity equipment $23,700 $62,500 $20,400
446,659
kWh
$3,300
-
kW-mo/yr
- - -
02 2.4322: Use or replace with energy efficient substitutes $8,100 $31,375 $6,100
134,941
kWh
$2,000
-
kW-mo/yr
- - -
03 2.5125: Size air handling grills/ duct/s coils to minimize air resistance $16,900 $33,800 $3,300
75,542
kWh
$1,000
-
kW-mo/yr
$3,300 $9,300 -
04 4.611: Begin a practice of predictive / preventative maintenance $35,400 $2,900 - - - - $35,400
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,825 $8,000 $5,015
182,365
kWh
$2,810
-
kW-mo/yr
- - -
06 2.4133: Use most efficient type of electric motors $2,306 $4,970 $1,494
32,791
kWh
$812
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $94,231 $143,545 $36,309
872,298
kWh
$9,922
-
kW-mo/yr
$3,300 $9,300 $35,400
TOTAL IMPLEMENTED $41,931 $106,845 $33,009
796,756
kWh
$8,922
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs