ITAC Assessment: OR0401
ITAC logo
ITAC Assessment: OR0401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $50
M
to 100
M
# of Employees 155
Plant Area
n/a
Annual Production 167,129,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $510,940 18,054,400
kWh
Electricity Demand $224,039 47,172
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,967,368 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $139,232

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
01 2.3212: Optimize plant power factor $76,739 $50,000 - $76,739
-
kW-mo/yr
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,160 $6,000 $4,140
146,100
kWh
$2,020
-
kW-mo/yr
- - - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $56,333 $68,000 $56,333
1,990,553
kWh
- - - - - -
04 2.2437: Recover waste heat from equipment $560,470 $690,000 - - $20,470
-
MMBtu
- - - $540,000
05 4.126: Install sensors to detect defects $524,500 $2,000,000 - - - $216,000 $(-150,000.0) - $458,500
06 4.122: Develop standard procedures to improve internal yields $473,166 $120,000 - - - - - - $473,166
07 4.322: Eliminate old stock and modify inventory control $270,000 $50,000 - - - - - $270,000 -
TOTAL RECOMMENDED $1,967,368 $2,984,000 $60,473
2,136,653
kWh
$78,759
-
kW-mo/yr
$20,470
-
MMBtu
$216,000 $(-150,000.0) $270,000 $1,471,666
TOTAL IMPLEMENTED $139,232 $124,000 $60,473
2,136,653
kWh
$78,759
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs