| Assessment Year | 2001 |
|---|---|
| Principal Product | Lumber |
| NAICS |
n/a
|
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $50 M to 100M |
| # of Employees | 155 |
| Plant Area |
n/a
|
| Annual Production | 167,129,000
thousand feet
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $510,940 | 18,054,400 |
kWh
|
$0.028 |
| Electricity Demand | $224,039 | 47,172 |
kW-mo/yr
|
$4.75 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,967,368 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $139,232 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $76,739 | $50,000 | - |
$76,739
-
kW-mo/yr
|
- | - | - | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,160 | $6,000 |
$4,140
146,100
kWh
|
$2,020
-
kW-mo/yr
|
- | - | - | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $56,333 | $68,000 |
$56,333
1,990,553
kWh
|
- | - | - | - | - | - | |
| 04 | 2.2437: Recover waste heat from equipment | $560,470 | $690,000 | - | - |
$20,470
-
MMBtu
|
- | - | - | $540,000 | |
| 05 | 4.126: Install sensors to detect defects | $524,500 | $2,000,000 | - | - | - | $216,000 | $(-150,000.0) | - | $458,500 | |
| 06 | 4.122: Develop standard procedures to improve internal yields | $473,166 | $120,000 | - | - | - | - | - | - | $473,166 | |
| 07 | 4.322: Eliminate old stock and modify inventory control | $270,000 | $50,000 | - | - | - | - | - | $270,000 | - | |
| TOTAL RECOMMENDED | $1,967,368 | $2,984,000 |
$60,473
2,136,653
kWh
|
$78,759
-
kW-mo/yr
|
$20,470
-
MMBtu
|
$216,000 | $(-150,000.0) | $270,000 | $1,471,666 | ||
| TOTAL IMPLEMENTED | $139,232 | $124,000 |
$60,473
2,136,653
kWh
|
$78,759
-
kW-mo/yr
|
- | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs