ITAC Assessment: OR0389
ITAC logo
ITAC Assessment: OR0389
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Culture Media
NAICS
n/a
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 3,072
Tgal
Production Hrs. Annual 2,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,729 685,716
kWh
Electricity Demand $4,459 1,956
kW-mo/yr
Natural Gas $25,799 4,002
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $334,057 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $334,057

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
01 4.421: Modify current incentive program $289,800 $26,680 - - - $289,800 - - - -
02 3.4146: Change method of deionized water production $29,980 $20,000 $(-128.0)
(-3,614)
kWh
$(-52.0)
-
kW-mo/yr
- - - - $30,160 -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,790 $4,721 - - - - - - - $6,790
04 2.1113: Reduce combustion air flow to optimum $5,384 $3,000 - - $5,384
-
MMBtu
- - - - -
05 2.7124: Make a practice of turning off lights when not needed $2,103 $590 $1,647
46,644
kWh
- - - $38 $418 - -
TOTAL RECOMMENDED $334,057 $54,991 $1,519
43,030
kWh
$(-52.0)
-
kW-mo/yr
$5,384
-
MMBtu
$289,800 $38 $418 $30,160 $6,790
TOTAL IMPLEMENTED $334,057 $54,991 $1,519
43,030
kWh
$(-52.0)
-
kW-mo/yr
$5,384
-
MMBtu
$289,800 $38 $418 $30,160 $6,790
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs