ITAC Assessment: OR0386
ITAC logo
ITAC Assessment: OR0386
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Liquid Fertilizer
NAICS
n/a
SIC 2875: Fertilizers, Mixing Only
Sales Range $1
M
to 5
M
# of Employees 7
Plant Area 10,000
ft2
Annual Production 219
Tgal
Production Hrs. Annual 4,480
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,756 873,382
kWh
Electricity Demand $12,182 29,232
kW-mo/yr
Electricity Fees $2,806 -
LPG $26,576 4,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,898 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,398

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $11,500 $10,500 - - - $(-750.0) $12,250
02 2.6218: Turn off equipment when not in use $12,600 - $12,600
239,663
kWh
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,007 - $1,474
28,125
kWh
$533
-
kW-mo/yr
- - -
04 2.4322: Use or replace with energy efficient substitutes $1,607 $3,763 $1,188
22,692
kWh
$419
-
kW-mo/yr
- - -
05 2.7124: Make a practice of turning off lights when not needed $2,184 - $1,838
35,096
kWh
- $29 $317 -
TOTAL RECOMMENDED $29,898 $14,263 $17,100
325,576
kWh
$952
-
kW-mo/yr
$29 $(-433.0) $12,250
TOTAL IMPLEMENTED $18,398 $3,763 $17,100
325,576
kWh
$952
-
kW-mo/yr
$29 $317 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs