ITAC Assessment: OR0383
ITAC logo
ITAC Assessment: OR0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Particle Board
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 200,000
ft2
Annual Production 37,204
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $460,680 10,382,181
kWh
Electricity Demand $106,329 232,500
kW-mo/yr
Electricity Fees $4,618 -
Wood $778,448 304,290
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $365,662 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $240,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings Personnel Changes Savings
01 4.445: Install equipment to move product $121,300 $252,800 $(-5,440.0)
(-122,802)
kWh
$(-960.0)
-
kW-mo/yr
- - $127,700
02 2.1231: Establish burner maintenance schedule for boilers $114,832 $600 - - - $114,832
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $43,523 $3,525 $40,822
919,988
kWh
$2,701
-
kW-mo/yr
- - -
04 2.4322: Use or replace with energy efficient substitutes $38,785 $45,275 $32,748
737,725
kWh
$6,037
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $26,070 $28,457 $21,700
488,863
kWh
$4,370
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,870 $18,000 $14,300
322,098
kWh
$2,570
-
kW-mo/yr
- - -
07 2.3212: Optimize plant power factor $4,282 $11,900 - - $4,282 - -
TOTAL RECOMMENDED $365,662 $360,557 $104,130
2,345,872
kWh
$14,718
-
kW-mo/yr
$4,282 $114,832
-
MMBtu
$127,700
TOTAL IMPLEMENTED $240,080 $95,857 $109,570
2,468,674
kWh
$15,678
-
kW-mo/yr
- $114,832
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs