ITAC Assessment: OR0379
ITAC logo
ITAC Assessment: OR0379
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Softwood Veneer
NAICS
n/a
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 50,000
ft2
Annual Production 1,280,000,000
thousand feet
Production Hrs. Annual 4,680
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $302,762 6,799,238
kWh
Natural Gas $315,161 77,419
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,065,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,383 $7,000 $4,286
125,440
kWh
$1,097
-
kW-mo/yr
- - -
02 2.4224: Upgrade controls on compressors $9,673 $15,010 $7,758
227,140
kWh
$1,915
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,146 - $900
26,377
kWh
$246
-
kW-mo/yr
- - -
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,099 $885 $2,897
84,701
kWh
$202
-
kW-mo/yr
- - -
05 2.7124: Make a practice of turning off lights when not needed $2,229 - $1,729
50,703
kWh
- - $42 $458
06 2.8112: Combine utility meters $1,715 $4,000 - $494
-
kW-mo/yr
$1,221 - -
07 2.4113: Install motor voltage controller on lightly loaded motors $9,628 $48,484 $7,525
220,397
kWh
$2,103
-
kW-mo/yr
- - -
08 2.3212: Optimize plant power factor $7,013 $19,600 - - $7,013 - -
09 4.131: Modify process to reduce material use/cost $1,026,000 $1,337,500 - - - - $1,026,000
TOTAL RECOMMENDED $1,065,886 $1,432,479 $25,095
734,758
kWh
$6,057
-
kW-mo/yr
$8,234 $42 $1,026,458
TOTAL IMPLEMENTED $18,110 $56,369 $14,708
430,538
kWh
$3,402
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs