ITAC Assessment: OR0370
ITAC logo
ITAC Assessment: OR0370
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Manufactured Homes
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 208
Plant Area
n/a
Annual Production 1,664
pieces
Production Hrs. Annual 0
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,773 1,848,769
kWh
Electricity Demand $21,510 66,732
kW-mo/yr
Electricity Fees $252 -
Natural Gas $75,096 12,137
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $131,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.2211: Use optimum temperature $27,300 - - - $27,300
-
MMBtu
- - -
02 2.2211: Use optimum temperature $4,900 $650 - - $4,900
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,673 $2,050 $2,642
74,736
kWh
$1,031
-
kW-mo/yr
- - - -
04 2.2437: Recover waste heat from equipment $2,748 $1,909 - - $2,748
-
MMBtu
- - -
05 4.131: Modify process to reduce material use/cost $92,680 - - - - $17,000
-
lb
- $75,680
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,089 $12,821 $2,155
60,961
kWh
$1,596
-
kW-mo/yr
- - $31 $307
TOTAL RECOMMENDED $135,390 $17,430 $4,797
135,697
kWh
$2,627
-
kW-mo/yr
$34,948
-
MMBtu
$17,000
-
lb
$31 $75,987
TOTAL IMPLEMENTED $131,301 $4,609 $2,642
74,736
kWh
$1,031
-
kW-mo/yr
$34,948
-
MMBtu
$17,000
-
lb
- $75,680
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs