ITAC Assessment: OR0367
ITAC logo
ITAC Assessment: OR0367
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Thermoformed Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 64
Plant Area 60,000
ft2
Annual Production 650,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,479 1,973,036
kWh
Electricity Demand $12,253 66,396
kW-mo/yr
Natural Gas $6,136 1,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $143,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,847

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $430 $1,360 $430
8,792
kWh
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,980 $26,760 $9,460
235,053
kWh
$1,520
-
kW-mo/yr
- -
03 2.7124: Make a practice of turning off lights when not needed $1,417 $565 $1,417
34,291
kWh
- - -
04 4.711: Initiate a total quality management program $63,000 $13,080 - - $63,000
-
lb
-
05 4.421: Modify current incentive program $67,500 $21,680 - - - $67,500
TOTAL RECOMMENDED $143,327 $63,445 $11,307
278,136
kWh
$1,520
-
kW-mo/yr
$63,000
-
lb
$67,500
TOTAL IMPLEMENTED $64,847 $15,005 $1,847
43,083
kWh
- $63,000
-
lb
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs