ITAC Assessment: OR0361
ITAC logo
ITAC Assessment: OR0361
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Low Density Fiber Board
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 310,000
ft2
Annual Production 160,000
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,236,281 36,371,923
kWh
Electricity Demand $279,874 1,008,552
kW-mo/yr
Electricity Fees $5,280 -
Natural Gas $1,205,452 492,021
MMBtu
LPG $7,759 1,823
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $207,723 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $24,471 $1,200 - - $24,471
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,408 $13,918 $4,553
133,939
kWh
$743
-
kW-mo/yr
- - $5,048 $2,064
03 2.2312: Minimize non-essential material in heat treatment process $3,020 $190 - - $3,020
-
MMBtu
- - -
04 4.441: Install automatic packing equipment $166,000 $63,000 - - - - $166,000 -
05 3.5316: Contract a wood pallet recycling company $1,824 - - - - $1,824
-
lb
- -
TOTAL RECOMMENDED $207,723 $78,308 $4,553
133,939
kWh
$743
-
kW-mo/yr
$27,491
-
MMBtu
$1,824
-
lb
$171,048 $2,064
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs