ITAC Assessment: OR0351
ITAC logo
ITAC Assessment: OR0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Artificial crab meat
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 200,000
ft2
Annual Production 16,380,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,123 7,360,492
kWh
Electricity Demand $79,872 214,368
kW-mo/yr
Electricity Fees $7,072 -
Natural Gas $108,567 24,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $25,756 - - - - - $25,756
02 2.2626: Avoid frost formation on evaporators $31,270 $48,000 $27,090
693,142
kWh
$4,180
-
kW-mo/yr
- - -
03 2.2621: Modify refrigeration system to operate at a lower pressure $4,590 - $4,590
117,526
kWh
- - - -
04 2.2414: Use waste heat from hot flue gases to preheat $4,270 $3,100 - - - $4,270
-
MMBtu
-
05 2.3212: Optimize plant power factor $1,595 $9,600 - - $1,595 - -
TOTAL RECOMMENDED $67,481 $60,700 $31,680
810,668
kWh
$4,180
-
kW-mo/yr
$1,595 $4,270
-
MMBtu
$25,756
TOTAL IMPLEMENTED $4,590 - $4,590
117,526
kWh
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs