ITAC Assessment: OR0330
ITAC logo
ITAC Assessment: OR0330
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product LCD
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 375
Plant Area 160,000
ft2
Annual Production 891,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $358,026 16,967,468
kWh
Electricity Demand $104,676 26,172
kW-mo/yr
Electricity Fees $11,660 -
Natural Gas $71,466 16,996
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $515,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.131: Modify process to reduce material use/cost $335,710 $438,500 $(-30,650.0)
(-1,452,521)
kWh
$(-11,620.0)
-
kW-mo/yr
- $(-12,800.0) $390,780
02 2.6218: Turn off equipment when not in use $4,900 - $4,900
233,294
kWh
- - - -
03 2.6218: Turn off equipment when not in use $690 - $690
32,532
kWh
- - - -
04 2.2628: Utilize a less expensive cooling method $163,740 $125,000 $135,040
6,398,886
kWh
- $28,700
-
MMBtu
- -
05 2.3212: Optimize plant power factor $10,538 $14,800 $10,538
216,882
kWh
- - - -
TOTAL RECOMMENDED $515,578 $578,300 $120,518
5,429,073
kWh
$(-11,620.0)
-
kW-mo/yr
$28,700
-
MMBtu
$(-12,800.0) $390,780
TOTAL IMPLEMENTED $4,900 - $4,900
233,294
kWh
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs