Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Polyurethane foam
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 186,000
ft2
Annual Production 33,600,000
lb
Production Hrs. Annual 4,810
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,206 2,416,764
kWh
Electricity Demand $47,952 9,990
kW-mo/yr
Electricity Fees $3,856 -
Natural Gas $52,182 12,238
MMBtu
LPG $8,380 775
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $449,765 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,255

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $300,000 $178,750 - - - - - - $300,000
02 4.111: Add equipment/ operators to reduce production bottleneck $88,020 $60,000 $(-280.0)
(-8,499)
kWh
$(-100.0)
-
kW-mo/yr
- - $88,400 - -
03 3.1192: Reduce scrap production $34,430 $11,000 $(-4,820.0)
(-143,611)
kWh
$(-1,730.0)
-
kW-mo/yr
- - - $40,980 -
04 2.1332: Convert combustion equipment to burn natural gas $11,110 $42,200 $(-210.0)
(-6,155)
kWh
$(-140.0)
-
kW-mo/yr
- $12,900
-
MMBtu
$(-1,440.0) - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,950 $800 $6,570
195,780
kWh
$2,110
-
kW-mo/yr
$(-2,730.0)
-
MMBtu
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,935 $2,000 $3,935
117,233
kWh
- - - - - -
07 2.2437: Recover waste heat from equipment $3,860 $3,700 $360
10,551
kWh
$130
-
kW-mo/yr
$3,370
-
MMBtu
- - - -
08 2.2136: Install / repair insulation on steam lines $2,460 $1,060 - - $2,460
-
MMBtu
- - - -
TOTAL RECOMMENDED $449,765 $299,510 $5,555
165,299
kWh
$270
-
kW-mo/yr
$3,100
-
MMBtu
$12,900
-
MMBtu
$86,960 $40,980 $300,000
TOTAL IMPLEMENTED $10,255 $6,760 $4,295
127,784
kWh
$130
-
kW-mo/yr
$5,830
-
MMBtu
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs