ITAC Assessment: OR0318
ITAC logo
ITAC Assessment: OR0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Plastic bottles and preforms
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 320,000
ft2
Annual Production 67,454,484
lb
Production Hrs. Annual 8,736
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,441,203 48,791,912
kWh
Electricity Demand $408,589 92,531
kW-mo/yr
Electricity Fees $20,020 -
LPG $4,194 549
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $328,492 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,384

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.5311: Recover and reuse waste material $173,800 $84,400 - - - $(-8,400.0)
-
lb
- $182,200
02 4.441: Install automatic packing equipment $107,110 $303,860 $(-1,010.0)
(-33,998)
kWh
$(-420.0)
-
kW-mo/yr
- - $108,540 -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,050 $24,750 $(-40.0)
(-1,465)
kWh
$(-590.0)
-
kW-mo/yr
- $7,680
-
lb
- -
04 2.2511: Insulate bare equipment $12,200 $2,450 $12,200
412,075
kWh
- - - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,184 $16,818 $7,498
253,810
kWh
$1,686
-
kW-mo/yr
- - - -
06 2.3212: Optimize plant power factor $19,148 $101,000 - - $19,148 - - -
TOTAL RECOMMENDED $328,492 $533,278 $18,648
630,422
kWh
$676
-
kW-mo/yr
$19,148 $(-720.0)
-
lb
$108,540 $182,200
TOTAL IMPLEMENTED $21,384 $19,268 $19,698
665,885
kWh
$1,686
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs