Assessment Year | 1998 |
---|---|
Principal Product | Plastic bottles and preforms |
NAICS |
n/a
|
SIC | 3085: Plastics Bottles |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
320,000
ft2
|
Annual Production | 67,454,484
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,441,203 | 48,791,912 |
kWh
|
$0.030 |
Electricity Demand | $408,589 | 92,531 |
kW-mo/yr
|
$4.42 |
Electricity Fees | $20,020 | - |
|
- |
LPG | $4,194 | 549 |
MMBtu
|
$7.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $328,492 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,384 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.5311: Recover and reuse waste material | $173,800 | $84,400 | - | - | - |
$(-8,400.0)
-
lb
|
- | $182,200 | |
02 | 4.441: Install automatic packing equipment | $107,110 | $303,860 |
$(-1,010.0)
(-33,998)
kWh
|
$(-420.0)
-
kW-mo/yr
|
- | - | $108,540 | - | |
03 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $7,050 | $24,750 |
$(-40.0)
(-1,465)
kWh
|
$(-590.0)
-
kW-mo/yr
|
- |
$7,680
-
lb
|
- | - | |
04 | 2.2511: Insulate bare equipment | $12,200 | $2,450 |
$12,200
412,075
kWh
|
- | - | - | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $9,184 | $16,818 |
$7,498
253,810
kWh
|
$1,686
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.3212: Optimize plant power factor | $19,148 | $101,000 | - | - | $19,148 | - | - | - | |
TOTAL RECOMMENDED | $328,492 | $533,278 |
$18,648
630,422
kWh
|
$676
-
kW-mo/yr
|
$19,148 |
$(-720.0)
-
lb
|
$108,540 | $182,200 | ||
TOTAL IMPLEMENTED | $21,384 | $19,268 |
$19,698
665,885
kWh
|
$1,686
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs