ITAC Assessment: OR0317
ITAC logo
ITAC Assessment: OR0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Printed Advertisments
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $50
M
to 100
M
# of Employees 285
Plant Area 93,750
ft2
Annual Production 96,443,807
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,618 10,065,065
kWh
Electricity Demand $56,742 18,040
kW-mo/yr
Electricity Fees $15,159 -
Natural Gas $225,034 63,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $286,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
01 4.611: Begin a practice of predictive / preventative maintenance $124,110 $23,900 - - - - $124,110
02 3.2176: Increase use of automation $71,400 $9,970 - - - - $71,400
03 2.2437: Recover waste heat from equipment $36,150 $26,600 - - - $36,150
-
MMBtu
-
04 2.4239: Eliminate or reduce compressed air usage $9,835 $23,520 $8,649
264,068
kWh
$1,186
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $38,890 $53,900 $34,330
1,048,359
kWh
$4,560
-
kW-mo/yr
- - -
06 2.3212: Optimize plant power factor $5,487 $31,200 - - $5,487 - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,004 $4,350 $804
24,619
kWh
$200
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $286,876 $173,440 $43,783
1,337,046
kWh
$5,946
-
kW-mo/yr
$5,487 $36,150
-
MMBtu
$195,510
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs