ITAC Assessment: OR0299
ITAC logo
ITAC Assessment: OR0299
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Paper Boxes
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 105,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,335 1,408,265
kWh
Electricity Demand $18,354 58,848
kW-mo/yr
Electricity Fees $2,142 -
Natural Gas $10,026 2,142
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $159,155 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $158,825

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
01 4.711: Initiate a total quality management program $154,770 - - - - - $68,000 $(-216,000.0) $2,770 $300,000
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,260 $2,500 $2,260
66,530
kWh
- - - - - - -
03 2.7124: Make a practice of turning off lights when not needed $583 - $393
11,430
kWh
- - - $61 - $129 -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $632 $105 $306
9,086
kWh
$86
-
kW-mo/yr
- - $21 - $219 -
05 2.1233: Analyze flue gas for proper air/fuel ratio $580 $1,500 - - - $580
-
MMBtu
- - - -
06 2.3212: Optimize plant power factor $330 $1,300 - - $330 - - - - -
TOTAL RECOMMENDED $159,155 $5,405 $2,959
87,046
kWh
$86
-
kW-mo/yr
$330 $580
-
MMBtu
$68,082 $(-216,000.0) $3,118 $300,000
TOTAL IMPLEMENTED $158,825 $4,105 $2,959
87,046
kWh
$86
-
kW-mo/yr
- $580
-
MMBtu
$68,082 $(-216,000.0) $3,118 $300,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs