ITAC Assessment: OR0290
ITAC logo
ITAC Assessment: OR0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Asphalt
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $1
M
to 5
M
# of Employees 3
Plant Area
n/a
Annual Production 163,500
ton
Production Hrs. Annual 2,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,505 635,111
kWh
Electricity Demand $24,602 5,592
kW-mo/yr
Electricity Fees $3,177 -
LPG $271,250 35,456
MMBtu
Fuel Oil #2 $2,520 469
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,449 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $349

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 4.423: Move product using mechanical means $7,230 $20,000 $(-870.0)
(-40,445)
kWh
$(-2,380.0)
-
kW-mo/yr
$2,510
-
MMBtu
- $7,970
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,870 $5,000 $8,460
394,197
kWh
$4,410
-
kW-mo/yr
$(-9,000.0)
-
MMBtu
- -
03 2.4133: Use most efficient type of electric motors $349 $2,216 $61
2,931
kWh
$288
-
kW-mo/yr
- - -
04 3.5311: Recover and reuse waste material $27,000 $260,000 - - - $27,000
-
lb
-
TOTAL RECOMMENDED $38,449 $287,216 $7,651
356,683
kWh
$2,318
-
kW-mo/yr
$(-6,490.0)
-
MMBtu
$27,000
-
lb
$7,970
TOTAL IMPLEMENTED $349 $2,216 $61
2,931
kWh
$288
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs