Assessment Year | 1997 |
---|---|
Principal Product | Asphalt |
NAICS |
n/a
|
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $1 M to 5M |
# of Employees | 3 |
Plant Area |
n/a
|
Annual Production | 163,500
ton
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $15,505 | 635,111 |
kWh
|
$0.024 |
Electricity Demand | $24,602 | 5,592 |
kW-mo/yr
|
$4.40 |
Electricity Fees | $3,177 | - |
|
- |
LPG | $271,250 | 35,456 |
MMBtu
|
$7.65 |
Fuel Oil #2 | $2,520 | 469 |
MMBtu
|
$5.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,449 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $349 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.423: Move product using mechanical means | $7,230 | $20,000 |
$(-870.0)
(-40,445)
kWh
|
$(-2,380.0)
-
kW-mo/yr
|
$2,510
-
MMBtu
|
- | $7,970 | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,870 | $5,000 |
$8,460
394,197
kWh
|
$4,410
-
kW-mo/yr
|
$(-9,000.0)
-
MMBtu
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $349 | $2,216 |
$61
2,931
kWh
|
$288
-
kW-mo/yr
|
- | - | - | |
04 | 3.5311: Recover and reuse waste material | $27,000 | $260,000 | - | - | - |
$27,000
-
lb
|
- | |
TOTAL RECOMMENDED | $38,449 | $287,216 |
$7,651
356,683
kWh
|
$2,318
-
kW-mo/yr
|
$(-6,490.0)
-
MMBtu
|
$27,000
-
lb
|
$7,970 | ||
TOTAL IMPLEMENTED | $349 | $2,216 |
$61
2,931
kWh
|
$288
-
kW-mo/yr
|
- | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs