ITAC Assessment: OR0285
ITAC logo
ITAC Assessment: OR0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Brine and Fresh Pack Cherries
NAICS
n/a
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 30,000
ft2
Annual Production 12,805,150
lb
Production Hrs. Annual 4,800
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,269 5,162,368
kWh
Electricity Demand $43,648 11,796
kW-mo/yr
Electricity Fees $205 -
Natural Gas $45,066 9,539
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,450 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,949

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 3.6192: Use a less expensive method of waste removal $33,432 - - - - $29,400 $4,032 - -
02 3.4154: Eliminate leaks in water lines and valves $464 $142 - - - - - - $464
-
Tgal
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $36,382 $10,450 $(-19.0)
(-879)
kWh
$(-34.0)
-
kW-mo/yr
$22,755
-
lb
$13,680 - - -
04 2.2621: Modify refrigeration system to operate at a lower pressure $1,815 - $1,815
89,390
kWh
- - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,671 $15,663 $1,705
84,115
kWh
$671
-
kW-mo/yr
- $3,124 - $1,171 -
06 2.4133: Use most efficient type of electric motors $686 $2,582 $454
22,274
kWh
$232
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $79,450 $28,837 $3,955
194,900
kWh
$869
-
kW-mo/yr
$22,755
-
lb
$46,204 $4,032 $1,171 $464
-
Tgal
TOTAL IMPLEMENTED $76,949 $26,255 $1,686
83,236
kWh
$637
-
kW-mo/yr
$22,755
-
lb
$46,204 $4,032 $1,171 $464
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs