ITAC Assessment: OR0284
ITAC logo
ITAC Assessment: OR0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product maraschino cherries
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 10,000
ft2
Annual Production 6,759,452
lb
Production Hrs. Annual 5,950
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,336 857,562
kWh
Electricity Demand $10,511 2,676
kW-mo/yr
Natural Gas $72,360 19,497
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,759 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,589

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $35,224 $10,450 $(-20.0)
(-879)
kWh
$(-36.0)
-
kW-mo/yr
- $20,400
-
lb
$14,880
02 2.2136: Install / repair insulation on steam lines $1,074 $516 - - $1,074
-
MMBtu
- -
03 2.2123: Insulate feedwater tank $291 $155 - - $291
-
MMBtu
- -
04 2.4133: Use most efficient type of electric motors $170 $804 $97
4,689
kWh
$73
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $36,759 $11,925 $77
3,810
kWh
$37
-
kW-mo/yr
$1,365
-
MMBtu
$20,400
-
lb
$14,880
TOTAL IMPLEMENTED $36,589 $11,121 $(-20.0)
(-879)
kWh
$(-36.0)
-
kW-mo/yr
$1,365
-
MMBtu
$20,400
-
lb
$14,880
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs