Assessment Year | 1996 |
---|---|
Principal Product | PVC and PE Pipe |
NAICS |
n/a
|
SIC | 3084: Plastics Pipe |
Sales Range | $10 M to 50M |
# of Employees | 104 |
Plant Area |
30,000
ft2
|
Annual Production | 36,213,459
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $301,207 | 8,133,646 |
kWh
|
$0.037 |
Electricity Demand | $64,410 | 15,696 |
kW-mo/yr
|
$4.10 |
Electricity Fees | $11,632 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,506 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,562 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,576 | - |
$1,359
36,928
kWh
|
$217
-
kW-mo/yr
|
- | - | |
02 | 2.2623: Minimize condenser cooling water temperature | $1,940 | $2,500 |
$1,940
52,462
kWh
|
- | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $6,986 | $15,828 |
$5,716
154,748
kWh
|
$1,270
-
kW-mo/yr
|
- | - | |
04 | 2.3212: Optimize plant power factor | $2,830 | $9,700 | - | - | $2,830 | - | |
05 | 3.5311: Recover and reuse waste material | $174 | - | - | - | - |
$174
-
lb
|
|
TOTAL RECOMMENDED | $13,506 | $28,028 |
$9,015
244,138
kWh
|
$1,487
-
kW-mo/yr
|
$2,830 |
$174
-
lb
|
||
TOTAL IMPLEMENTED | $8,562 | $15,828 |
$7,075
191,676
kWh
|
$1,487
-
kW-mo/yr
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs