ITAC Assessment: OR0280
ITAC logo
ITAC Assessment: OR0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product PVC and PE Pipe
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area 30,000
ft2
Annual Production 36,213,459
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $301,207 8,133,646
kWh
Electricity Demand $64,410 15,696
kW-mo/yr
Electricity Fees $11,632 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,506 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,576 - $1,359
36,928
kWh
$217
-
kW-mo/yr
- -
02 2.2623: Minimize condenser cooling water temperature $1,940 $2,500 $1,940
52,462
kWh
- - -
03 2.4133: Use most efficient type of electric motors $6,986 $15,828 $5,716
154,748
kWh
$1,270
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $2,830 $9,700 - - $2,830 -
05 3.5311: Recover and reuse waste material $174 - - - - $174
-
lb
TOTAL RECOMMENDED $13,506 $28,028 $9,015
244,138
kWh
$1,487
-
kW-mo/yr
$2,830 $174
-
lb
TOTAL IMPLEMENTED $8,562 $15,828 $7,075
191,676
kWh
$1,487
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs