ITAC Assessment: OR0275
ITAC logo
ITAC Assessment: OR0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Treated Railroad Ties
NAICS
n/a
SIC 2491: Wood Preserving
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 3,500,000
ft2
Annual Production 3,505,832
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,509 2,179,953
kWh
Electricity Demand $16,613 8,868
kW-mo/yr
Natural Gas $118,144 48,915
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,532

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 3.1192: Reduce scrap production $3,761 - - - - $12,017
-
lb
$(-7,680.0) $(-576.0)
02 2.1233: Analyze flue gas for proper air/fuel ratio $9,894 $500 - - $9,894
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,493 $5,000 $2,610
128,664
kWh
$883
-
kW-mo/yr
- - - -
04 2.4133: Use most efficient type of electric motors $278 $1,091 $188
9,379
kWh
$90
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $17,426 $6,591 $2,798
138,043
kWh
$973
-
kW-mo/yr
$9,894
-
MMBtu
$12,017
-
lb
$(-7,680.0) $(-576.0)
TOTAL IMPLEMENTED $7,532 $6,091 $2,798
138,043
kWh
$973
-
kW-mo/yr
- $12,017
-
lb
$(-7,680.0) $(-576.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs