ITAC Assessment: OR0269
ITAC logo
ITAC Assessment: OR0269
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Carbonated Beverages
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 76,600
ft2
Annual Production 27,544,462
Tgal
Production Hrs. Annual 4,872
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,058 3,621,337
kWh
Electricity Demand $41,271 9,960
kW-mo/yr
Electricity Fees $6,885 -
Natural Gas $37,204 9,357
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $92,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $703 $409 - - - $703
-
MMBtu
- -
02 2.4133: Use most efficient type of electric motors $4,741 $6,752 $3,566
97,011
kWh
$1,175
-
kW-mo/yr
- - - -
03 2.3212: Optimize plant power factor $1,640 $5,700 - - $1,640 - - -
04 3.3122: Use filtration, centrifuging to remove contaminants $85,508 $330,000 $4,806
130,422
kWh
$858
-
kW-mo/yr
- - $3,960
-
lb
$75,884
TOTAL RECOMMENDED $92,592 $342,861 $8,372
227,433
kWh
$2,033
-
kW-mo/yr
$1,640 $703
-
MMBtu
$3,960
-
lb
$75,884
TOTAL IMPLEMENTED $92,592 $342,861 $8,372
227,433
kWh
$2,033
-
kW-mo/yr
$1,640 $703
-
MMBtu
$3,960
-
lb
$75,884
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs